To recommision the shaft a new winder was required. As well as a full recomissioning of the shaft infrastructure above and below ground.
Revision Zero was commisioned to detail all the structural steel. Also included was the detailing of the platework, chutes (incl liners) and bins along with the detailing of the mechanical items. In total appox 800 Tonne of steel was detailed.