๐ฅ๐ฒ๐๐ถ๐๐ถ๐ผ๐ป ๐ญ๐ฒ๐ฟ๐ผ ๐๐ผ๐บ๐ฝ๐น๐ฒ๐๐ฒ๐ ๐๐ฒ๐ป๐ด๐ฎ๐น๐น๐ฎ ๐ ๐ถ๐ป๐ฒ ๐๐ฒ๐ฒ๐ฑ๐ฒ๐ฟ ๐ฃ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐ โ
We are proud to announce the successful completion of the Bengalla Mine Feeder Project in Q1 2025 โ a testament to our commitment to delivering precision-engineered solutions for Australiaโs mining industry.
๐ ๐๐ฏ๐ผ๐๐ ๐๐ฒ๐ป๐ด๐ฎ๐น๐น๐ฎ ๐ ๐ถ๐ป๐ฒ
Located in the Hunter Valley near Newcastle, NSW, Bengalla Mine is known for its complex geology and high production output. The project demanded a high level of accuracy and seamless integration with existing operations โ and our team delivered.
๐ง ๐ข๐๐ฟ ๐ฆ๐ฐ๐ผ๐ฝ๐ฒ:
Bifurcated Chute
Discharge Chute Skirting
Feeder Support Structures
Access Platform & Handrail Systems
Guarding & Gratings
๐ ๐๐ฒ๐ ๐ฆ๐๐ฎ๐๐:
3D modelling & workshop drawings
~4.5 tons of structural steel
~125 linear meters of handrail
๐ก Delivered on schedule and to the full satisfaction of our client and site operators.
๐ Congratulations to our in-house engineering and drafting teams for their collaboration and attention to detail, ensuring a smooth integration with Bengallaโs existing infrastructure.