Another one of those small but meaningful projects we’re proud to deliver for our clients.
The Proposed Solar Farm Ancillary Foundation at Kerang Solar Park, Victoria may not be large in scale, but its role is critical — providing the solid base needed to support solar arrays, battery systems, and control buildings that keep renewable energy infrastructure reliable and future-proof.
Awarded to Revision Zero and completed midway 2024, our scope included:
✅ 3D modelling and workshop fabrication drawings
✅ 15 tons of structural steel
✅ 287 linear meters of handrail
✅ 171 square meters of grating
Every project — big or small — contributes to a more sustainable future, and we’re delighted to play our part in enabling renewable energy across Australia. ⚡