Cadia: Years of Detailing Excellence
Revision Zero has been proud to support the Cadia Mine for the better part of a decade, contributing to dozens of packages across one of Australia’s largest and most advanced gold and copper operations.
One such package is the Cadia Molybdenum Project — a strategic development that adds molybdenum recovery to Cadia’s already impressive output. Molybdenum, used in high-strength steel and aerospace components, will now be extracted as a byproduct from existing copper-gold concentrate. The standalone processing plant integrates with current infrastructure to boost both economic value and resource efficiency.
Our role included 3D modelling and detailed shop drawings for:
- Plant Infrastructure 1
- Flotation Structure & Pipe Supports
- Concentrate Storage & Handling Areas
- East-West Pipe Rack
- NaHS Platform
This package is just one of many that Revision Zero has completed at Cadia — a site where we’ve modelled and detailed tens of thousands of tonnes of structural steel, conveyors, mechanical systems, handrails, gratings, and pipework over the years.
We’re incredibly proud of our long-standing contribution to the Cadia legacy and the collaborative partnerships we’ve built along the way. #revisionzero