🏗️ Project Highlight: Carrapateena Pump Station 1
In Q2 2020, Revision Zero successfully delivered structural detailing services for Pump Station 1 at the Carrapateena Mine — one of Australia’s most significant copper-gold operations.
📍 Located 160 km north of Port Augusta and 100 km southeast of Olympic Dam, Carrapateena produces over 67,000 ounces of gold and 65,000 tonnes of copper annually.
This project was part of our continued involvement in major work packages supporting the mine’s expansion and infrastructure development.
🔩 Our scope included 3D modelling and detailing for:
- Structural pipe supports
- Trommel platform
- Vertical dam cone
- Access stairs
- Bolt boxes
- Handrails
- Gratings
- Crane weight box
đź’ŞÂ Totalling approx. 34 tonnes, every element was precisely modelled for fabrication, reinforcing our commitment to high-quality, constructible steel detailing.
Proud to be part of the team helping build the future of Australian mining.
#Carrapateena #MiningProjects #StructuralSteel #SteelDetailing #DigitalConstruction #RevisionZero #CopperGold #AustralianMining #BIM #ConstructionModeling