The Chiyoda Direct MCH Project was successfully Finished by Revision Zero in September 2025. The Construction of Chiyoda Direct MCH (Direct Methylcyclohexane) is planned to start around 2025, and the plant is expected to be completed and begin production by around mid-2026. The plant is being developed on approximately 6,000 m² of land on Bulwer Island, Brisbane, in the state of Queensland, Australia.
The purpose of the Chiyoda Direct MCH (Direct Methylcyclohexane) project is to demonstrate and validate large-scale green hydrogen production and transport using MCH as a liquid organic hydrogen carrier, enabling efficient storage, shipping, and utilization of hydrogen with existing infrastructure.
Revision Zero undertook this project, which includes and limited to 3D modelling services and the preparation of drawings for structural steel for approximately 11.85 tonnes along with approximately 80.21 Linear meters for handrail and total of 125.5 square meter of grating.