Kurri North Switching Station Project was completed by Revision Zero in last quarter of 2023. It is located in 1 Hart Road, Loxford of New South Wales, Australia.

As a part of Hunter Power Project also known as Kurri Kurri Power Station, this 132 Kilovolt Electrical Switching Station aims and help to generate economic benefits for New South Wales as a whole. Switch yard equipment would include underground cables and overhead line gantries to transmit power in other associated infrastructure and facilities within the area.

Revision Zero’s scope of work for this project included 3D Modelling and shop detailing of Switching Room Station with approximately 10 tons of steel.

For this package, the work scope included:

  • Control Building Structure Steel Frame
  • Chequer Plate
  • Aircon frame