Olympic Dam

The Olympic Dam Mine in South Australia is one of the world’s most extraordinary mining sites, holding immense deposits of copper, uranium, gold, and silver. Home to the largest known copper deposit and the single largest uranium deposit globally, Olympic Dam stands as a powerhouse of resources. The site’s extensive operations, spanning both surface and underground facilities, include nearly 700 kilometers of roads and tunnels, showcasing engineering prowess on an impressive scale. This mine is a crucial contributor to local and national economies, offering substantial employment and sustaining the nearby town.

In alignment with its vision for efficiency and expansion, Olympic Dam is currently undergoing significant upgrades. Revision Zero was selected to deliver precise 3D modeling and structural steel detailing for these enhancements.

Scope of Work:

  • Crusher Drive Level Platform
  • Crusher Feed Level Platform
  • Seal Air Blower
  • Shedder & Drain
  • Access Tower Protection
  • Stacker Shedder
  • Stacker Protection
  • Cable Supports
  • Control Cabinet Bases


Revision Zero’s accurate and dependable detailing, seamlessly integrating with concrete and mechanical components, has been critical to the smooth and successful execution of these complex brownfield upgrades. This collaboration underscores Revision Zero’s commitment to excellence and adaptability, setting a high standard for structural support in the mining industry.