Santos Area 1069 Tirrawarra & Area 1083 Moomba North

Revision Zero successfully completed the Santos Area 1069 Tirrawarra and Area 1083 Moomba North project in the 1st quarter of 2023.

This project is located in the Southwestern portion of the Permian–Triassic Cooper Basin in central Australia. The Tirrawarra oil and gas field, the largest discovered in the basin, is approximately 50 km north of the Moomba processing facility.

Tirrawarra, a conventional gas field, commenced production in 1985, recovering an impressive 92.18% of its whole recoverable reserves. In contrast, Moomba North, an unconventional gas field, achieved its peak production in 2002, recovering 94.17% of its total recoverable reserves.

An associated expansion project, the Tirrawarra Development project, focuses on concept development for facilities and infrastructure related to CO2 capture, compression, separation, and delivery to the injection well.

Revision Zero’s engagement encompassed 3D Modeling services, including the creation of workshop fabrication drawings. This involved structural steel weighing approximately 16 tons, around 86 linear meters of handrail, and a total of 35 square meters of grating.