The WA Test Rig Project was successfully Finished by Revision Zero in the year 2024. The Project was located at 11 Earnest Clark Road Canning Vale Perth Western Australia.
The project is a part of WA Test Rig in which aims to evaluate and validate new mineral processing technologies, machinery, and systems. The test rig is designed to simulate real-world processing conditions, allowing for the testing of equipment under controlled, extreme scenarios. It is also intended to assess new technologies and optimize processes such as gravity separation, flotation, and magnetic separation to improve yields, reduce energy consumption, and enhance the sustainability of mining operations.
Revision Zero undertook this project, which includes 3D modelling services and the preparation of drawings for structural steel for approximately 163 tons along with approximately 125 Linear meters for handrail and total of 45 square meter of grating.