Since 2018 Revision Zero has been working on the Carrapateena Underground Mine. In 2019 the works were completed. Revision Zero on the back of the work completed were awarded the Block Cave Expansion works. In 2021, one of the smaller packages were also award to Revision Zero, the Carrapateena Refrigeration Plant.