Tallawarra B Power Station

Tallawarra B Project was completed by Revision Zero in last quarter of 2022. It was located on the shores of Lake Illawarra at Energy Australia’s existing Tallawarra power station.

Tallawarra B Project is the development of a fast-start open cycle open power station that, during peak hours will supply reliable power to an additional 150,000 New South Wales residences. This project will be first peaking power station in Australia to be fueled by a gas and green hydrogen mixture with direct emission offset.

Revision Zero was awarded the scope of work to provide 3d models as well as the preparation of workshop fabrication drawings, detailing of structural steel, gratings and handrails for the following areas:

  • Pipe Rack & Support Steelwork
  • Transformer Firewall
  • E-Room Support & Platforms
  • LEC Support & Platform
  • Stair Tower 1 & 2
  • IPB Structure & Duct Supports
  • Lube Oil Platform
  • Power Island Pipe Rack
  • Air Compressor Shed
  • GT Platform Steel
  • Transformer Access Stair